Skip to Content
Annex
Treatment: Methyl bromide fumigation followed by cold treatment schedules
Effective 13 October 2021
- 32 grams m-3 for two hours at a pulp temperature of 21°C or greater at not more than 50% chamber load, followed by cold treatment at a pulp temperature of 2.77°C or lower for four days.
- 32 grams m-3 for 2.5 hours at a pulp temperature of 21°C or greater at not more than 50% chamber load, followed by cold treatment at a pulp temperature of 4.44°C or lower for four days.
- 32 grams m-3 for three hours at a pulp temperature of 21°C or greater at not more than 50% chamber load, followed by cold treatment at a pulp temperature of 8.33°C or lower for three days.